000off_GOODBYE A-L, HELLO 1-7

RIBA scraps Plan of Work: say goodbye to stages A-L

Anthony Hoete, director, WHAT_architecture reports in the AJ: ‘While a re-alignment of the RIBA work stages maybe potentially worthwhile, in terms of foreign joint venture workability, a pan-European alignment of work stages that equilibrates the RIBA work stages with the HOIA (in Germany) with the French Loi MOP would be of more value.’

SAY WHAT_!?

Leave a Reply